Domestic installation can take as little as a single day to complete. There are 3 main components to installation:
1. Scaffolding erected
2. Solar Panel Mounting frame is fixed to the roof rafter, sliding underneath the existing tiles, meaning there is no need for any roof work
3. The Inverter is installed in your loft and connected to the Solar Panels. The Generation Meter is then installed next to your fuse board and connected.
1.The roof is checked to be in good repair…
2. the brackets are fixed to the roof joists and the tiles made to sit flush again.
3. The rails are fixed to the brackets and aligned.
4. If you are using Enecsys Micro Inverters, these are now fixed to the rails.
5. The panels are fixed to the rails.
6. All the panels are put in place.
7. The Inverter is installed (if not using Enecsys Micro Inverters) and electrical connections made.
8. Your system is installed, registered by Cernunnos Homes and then handed over to you!
Maintenance is relatively simple, with the panels possibly needing cleaning once a year. Cernunnos Homes offer this service. We can also monitor the performance of the panels, ensuring you get the maximum from your system.
Let us not forget, you can always have a Ground Mounted System. Some people do not want panels on their roof – maybe they could have them at the bottom of their garden!